140+

— Verified Project Record

97%

Completed builds. Documented specs. On-time delivery.

Completed builds

On-time delivery rate

Every entry below lists component categories, production volumes, and verified delivery outcomes — no vague summaries, no redacted specs.

Overhead close-up of a populated IC substrate on an assembly station, solder paste visible on component pads, bright north-facing overhead lighting, clean workstation surface
Overhead close-up of a populated IC substrate on an assembly station, solder paste visible on component pads, bright north-facing overhead lighting, clean workstation surface
Close-up overhead view of bare PCB with IC placement markings, component reels staged beside the board, bright diffuse overhead lighting, organized production table
Close-up overhead view of bare PCB with IC placement markings, component reels staged beside the board, bright diffuse overhead lighting, organized production table
Overhead view of a partially assembled rack-mount router chassis on a clean assembly station, discrete port modules visible, bright overhead fluorescent lighting, documented workstation
Overhead view of a partially assembled rack-mount router chassis on a clean assembly station, discrete port modules visible, bright overhead fluorescent lighting, documented workstation
Close-up of network router board with populated Ethernet switch ICs and magnetics, quality-check probe resting beside the board, bright overhead lighting, organized lab environment
Close-up of network router board with populated Ethernet switch ICs and magnetics, quality-check probe resting beside the board, bright overhead lighting, organized lab environment
/ Integrated Circuit Builds
Custom ASIC Module
Mixed-Signal IC Array

High-density logic IC for industrial control

Mixed-signal array for power conversion systems

Components: 847 unique line items, sourced to original manufacturer. Volume: 2,400 units. Delivery: 18-week schedule, completed on day 124.

Components: 312 line items, no approved substitutions. Volume: 600 units. Delivery: 12-week schedule, completed on day 81.

/ Router & Networking Hardware Builds
Enterprise Core Router
Industrial Edge Router

Core routing hardware for data center deployment

Edge routing module for field-deployed OEM systems

Components: 1,140 line items across chassis, switching fabric, and port modules. Volume: 180 units. Delivery: 22-week schedule, completed on day 151.

Components: 428 line items, all sourced from approved vendor list. Volume: 950 units. Delivery: 14-week schedule, completed on day 97.

• Client Outcomes

What clients verified after delivery

Every part on the BOM arrived traced to its source. Zero field failures at 6-month review. That's the standard we needed.

Schedule held through a component shortage. They flagged the risk on week three and delivered on the original date with full documentation.

We submitted a 900-line BOM. They confirmed sourcing within two days and held the spec exactly — no substitutions, no surprises.

Engineering Manager, Network Systems Integrator

VP of Hardware Engineering, Commercial OEM

Director of Procurement, Industrial OEM

Ready to submit your BOM?

Send us your bill of materials. We'll confirm sourcing, lock the production schedule, and document every step from intake to delivery.